B2B SaaS Industrial Platform

Real-Time OEE Software
for Modern Factories

Stop running your shifts on retrospective data. Automate Overall Equipment Effectiveness (OEE) tracking, pinpoint the Six Big Losses instantly, and drive continuous improvement — with zero PLC code modifications.

AdaptNXT OEE Dashboard
LIVE DATA
Availability
92.4%
Performance
87.1%
Quality
98.2%
Line Alpha — Day Shift
Computed OEE Score
79.0% OEE
Status: Good
Line Beta — Setup Overrun
Six Big Loss: Changeover
61.3% OEE
Warning
Platform Differentiators

Built for Mixed-Age Factory Fleets

Traditional OEE tools require expensive PLC logic rewrites. AdaptNXT uses a non-invasive telemetry stack.

Non-Invasive Retrofits

Read cycle counts and machine states using external sensors, CT clamps, or read-only Modbus connections. We shield your core PLC programs from any modifications — no production halts, no warranty risks.

Six Big Losses Breakdown

Don't just settle for an OEE percentage. Our software automatically classifies downtime into setup overruns, micro-stops, cycle speed loss, and reject counts — so you can prioritize the right fix.

Financial Loss Leakage

Convert performance percentages into money. Show the CFO precisely what hourly bottlenecks cost in annual revenue — and prioritize maintenance spend where it delivers the highest OEE ROI.

Real-Time OEE Tracking

Calculate OEE = Availability × Performance × Quality automatically from live machine data. Detect micro-stops and speed losses the moment they happen — not hours later in a spreadsheet review.

Predictive Alerts & Anomaly Detection

Set threshold-based OEE alerts or enable ML anomaly detection to catch performance degradation before it collapses your score. Receive instant notifications via SMS, email, or webhook integrations.

ERP & MES Integration

Sync OEE scores, downtime reasons, and part count aggregates directly with SAP, Oracle, or your existing MES via our secure REST API and webhook event streams. No middleware required.

Onboarding Roadmap

Our 8-Week Fixed-Price OEE Pilot

Mitigate deployment risk. We connect 3 to 8 machines and establish verified OEE baselines before you commit to scaling across the plant.

  • Non-invasive sensor installation with zero production stoppage.
  • Verified OEE baseline with top 3 downtime loss categories identified.
  • Quantified ROI business case delivered by Week 8.
Start Your OEE Pilot

8-Week Pilot Structure

1
Weeks 1–2: Installation

Mount edge gateways, deploy non-invasive sensors, configure live dashboards per machine.

2
Weeks 3–4: Baseline Audit

Establish raw OEE baselines. Identify top 3 downtime categories dragging down shifts.

3
Weeks 5–8: ROI Verification

Kaizen focus on bottlenecks, compare baseline vs. improvement, quantify annual ROI.

Proof of Performance

Real Results from the Shop Floor

Tier-1 Auto Parts Plant

OEE Lifted from 58% to 78%+

We retrofitted 40 legacy CNC milling machines with non-invasive vibration, current, and temperature sensors. By automating OEE tracking and deploying predictive anomaly models, the client eliminated major spindle failures and reduced unplanned downtime by 40%.

Baseline OEE ~58%
Post-Deployment 78%+
Downtime Reduction 40%
Read full case study
Spindle bearing predictive anomaly tracking dashboard
Frequently Asked Questions

Objections Handled

Everything you need to know about evaluating and deploying AdaptNXT's OEE software.

Yes. We specialize in brownfield setups. For legacy CNCs, presses, or assembly equipment without network ports, we deploy external non-invasive sensors (like current clamps and photo-electric count triggers) connected to our optically-isolated edge gateways. Your machines are monitored safely with zero risk of electrical loops or warranty voids.

No. Our edge gateway includes local SPI Flash storage buffering. If your factory Wi-Fi or cellular network drops, all machine cycles and telemetry timestamps are cached locally and synchronized with the cloud once connection returns. No data points are lost.

Yes. Our cloud platform exposes secure REST APIs and real-time webhook integrations. Downtime reasons, part count aggregates, and computed OEE scores can be synchronized directly with your ERP, MES, or local database systems.

Our 8-week pilot is structured for rapid deployment. We install gateways on 3–8 bottleneck machines in Week 1, establish OEE baselines by Week 3, identify top downtime losses in Week 5, configure real-time warning alerts by Week 7, and present the quantified business case by Week 8.

Industry benchmarks consider 85% OEE as world-class. Most manufacturing plants start between 40%–60% when they first begin tracking OEE accurately. A realistic first-year goal is to move from your baseline to 70%+ by addressing the top two or three loss categories identified by the system.

Drive Shop Floor Efficiency with Real-Time OEE

Get accurate, real-time OEE metrics and identify hidden capacity on your bottleneck lines today.

Call
WhatsApp
Email